Pakistan Petroleum enhances gas production in Gambat South block
This operation is the first water shut-off by the company
Business Desk
The Business Desk tracks economic trends, market movements, and business developments, offering analysis of both local and global financial news.

Pakistan Petroleum Limited (PPL) has increased gas production at its Gambat South block following a successful water shut-off operation at the Shahdad X-1 well.
The flow rate at Shahdad X-1 rose from 2.2 million standard cubic feet per day (mmscfd) to 8.4 mmscfd.
This operation also reduced water production from 3,000 barrels per day (BPD) to 26 BPD, marking a substantial improvement in well performance.
Drilled in 2012 and operational since 2015, Shahdad X-1 originally produced 26 mmscfd of gas.
However, by 2024, production had declined due to significant water production. A Production Logging Tool (PLT) survey in August 2024 identified the need for effective remediation.
This operation is the first water shut-off in the Gambat South Block and marks the debut use of acid-soluble cement technology in PPL’s portfolio.
The success highlights PPL’s technical expertise, operational excellence, and commitment to enhancing production from mature fields.







Comments
See what people are discussing